Double Girder Overhead Crane with Winch Trolley
Description
The crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder. Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device. There are full field of view Cabin suspend under the main girder, there are joint control desk or single control box packed within the Cabin, assemble the sidelong ladder between the Cabin and moving table, The main girder joint with the two side end carriage which with the joint point in the middle.
Features
1. Reasonable structure, light dead weight
2. Favorable performance, accurate and smooth lifting.
3. Safe and reliable traveling
4. Low noise, easy operation,
5. Convenient maintenance, high exchangeability for parts and components
6. Main girder: box-shaped girder .
7.Controlled by push button, remote or cabin.
8.Forbidden to use in easily combustible, explosive, corrosive and melting metal works.
Specifications
Mechanism | Item | Unit | Result | |
Item | ||||
Lifting capacity | ton | 5-350 | ||
Lifting height | m | 1-20 | ||
Span | m | 10.5-31.5 | ||
Working environment temperture | °C | -25~40 | ||
Speed | Hoisting | Main | m/min | 0.84-9.5 |
Aux. | 5.22-12.6 | |||
crab | 5.8-38.4 | |||
trolley | 17.7-78 | |||
Working system | A5-A6 | |||
Power source | three-Phase A C 50HZ 380V |